> For the complete documentation index, see [llms.txt](https://www.opal-rt.com/docs/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://www.opal-rt.com/docs/courseware/electric-courseware/renewable-energy/microgrid-system/panels-overview.md).

# Panels Overview

## Understand the panel <a href="#understanding-the-panel" id="understanding-the-panel"></a>

The **Micro Grid** model file, located in the folder **OP1142 - Renewable Energy,** is **RE\_Courseware\_Microgrid-version.zip**

When starting the demo, three panels can be selected. They are named Main, Acquisition, and Profiles. They can be seen under Panels (inside the red ellipse) in figure 3.\
In this section, the description of each of these panels is provided.

<figure><img src="https://4054096626-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FYbyVjpgEQX9nfCkpYoFP%2Fuploads%2FktwDhAeNwDIW0lVccLlq%2F5929d681-3ec4-46c3-988e-2bc06645d58a.png?alt=media&amp;token=b00dd57f-fa10-451e-b83d-a50649a431f5" alt=""><figcaption><p><strong>Figure 3</strong>: Panels of the Microgrid Laboratory</p></figcaption></figure>

## Main Panel <a href="#main-panel" id="main-panel"></a>

When selecting the panel referred to as Main under Panels, figure 4 below appears with the default settings.\
To simulate the two operation modes of the microgrid, the student can open or close the breaker near the Primary distribution substation.\
When the push button for the islanding breaker is green, **Mode 1** is active.\
Otherwise, **Mode 2** is active.

<figure><img src="https://4054096626-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FYbyVjpgEQX9nfCkpYoFP%2Fuploads%2FPJ777Ni8tQ6FY8W7NLqr%2F1ac8c91e-2cfe-4cca-ac3e-573ba5b9bfd5.png?alt=media&amp;token=d7e8d150-4f92-4192-afbc-97d3e6456694" alt=""><figcaption><p><strong>Figure 4</strong>: Main Panel of the Microgrid Laboratory</p></figcaption></figure>

The parameters such as wind speed, solar irradiance, power from (or to) the main grid utility, and loads are represented by sliders that enable to modify their default values.\
The controller can be activated or deactivated through the on/off button.\
In addition, the student can control through the panel whether to operate the battery bank as a ”PV” or ”PQ” bus.\
For ”PV mode” the active power and the voltage are known, while for ”PQ mode” the active and reactive powers are known.

A 24-hours solar irradiance, load demand, and wind speed profiles taken from California ISO webpage, can be simulated for the microgrid operation by a simple push button.\
The color red for the button indicates that the profiles are not active, while a color green indicates otherwise.

### Control Parameters of the Microgrid

Table 2 below summarizes the control parameters of the microgrid.

<table data-search="false"><thead><tr><th>Control Parameters</th><th>Default Value</th><th>Interval of Variation</th></tr></thead><tbody><tr><td><strong>Irradiance E (W/m</strong><sup><strong>2</strong></sup><strong>)</strong></td><td>950</td><td>[0; 1000]</td></tr><tr><td><strong>Voltage Reference Vref (p.u.)</strong></td><td>1</td><td>[0.95; 1.05]</td></tr><tr><td><strong>Reactive Power Reference Pref (kVAR)</strong></td><td>0</td><td>[-60; 60]</td></tr><tr><td><strong>Wind Speed (m/s)</strong></td><td>5</td><td>[0; 25]</td></tr><tr><td><strong>Load 1 (kW)</strong></td><td>9</td><td>[0; 27]</td></tr><tr><td><strong>Load 2 (kW)</strong></td><td>12</td><td>[0; 25]</td></tr><tr><td><strong>Demand Response of Load 2 (kW)</strong></td><td>0</td><td>[0; 9]</td></tr><tr><td><strong>Load 3 (kW)</strong></td><td>10</td><td>[0; 18]</td></tr></tbody></table>

{% hint style="info" %}
The current, voltage and power displays shown in figure 4 are related to the components close to them.\
The active power displays can help the student validate active power balance for the system.
{% endhint %}

## Acquisition Panel <a href="#acquisition-panel" id="acquisition-panel"></a>

When the panel referred to as Acquisition is selected, figure 5 appears with the default settings.\
Under the Acquisition panel, the student should find Battery Acquisition, PV Acquisition and Wind Turbine Acquisition.\
Figures 5 to 7 below show the acquisition panels for the battery, the PV, and the wind turbine.

<figure><img src="https://4054096626-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FYbyVjpgEQX9nfCkpYoFP%2Fuploads%2Fxd3rjthH9nfhb04jbMJC%2Fdb9b727b-9da7-4bab-8d10-6cdd52725ddd.png?alt=media&amp;token=edfb8d82-1f15-4829-984d-6080a63cd489" alt=""><figcaption><p><strong>Figure 5</strong>: Acquisition Panel of the Microgrid Laboratory - BESS Acquisition</p></figcaption></figure>

### Battery Acquisition <a href="#battery-acquisition" id="battery-acquisition"></a>

As shown in figure 5 above, the 60 kW battery energy storage can be simulated with and without connection to the main grid.\
The student can push the ’**Grid-Connected**’ button for connection/disconnection.\
The panel offers the student the opportunity to operate the battery either in ”PQ mode” or in ”PV mode” through the “**Operation mode**” button.\
In the scopes are displayed the BESS DC voltage and current, the SoC, the grid and BESS reactive powers, the three-phase AC voltages and currents of the BESS, and the active powers of the grid, PV, WT, BESS, and loads.

### PV Acquisition <a href="#pv-acquisition" id="pv-acquisition"></a>

As presented in figure 6 below, the 12 kW PVGS can be simulated with and without connection to the main grid.\
The student can push the ’**Grid-Connected**’ button for connection/disconnection.\
In the scopes are displayed the PV DC voltage and current, the three-phase AC voltages and currents of the PV, and the PV output power.

### Wind Turbine Acquisition <a href="#wind-turbine-acquisition" id="wind-turbine-acquisition"></a>

As observed in figure 7 below, the 12 kW wind turbine can be simulated with and without connection to the main grid.\
The student can push the ’**Grid-Connected**’ button for connection/disconnection.\
In the scopes are displayed the three-phase AC voltages and currents, the frequency, and the output power of the wind turbine generation system.

<figure><img src="https://4054096626-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FYbyVjpgEQX9nfCkpYoFP%2Fuploads%2FnU1urt83nRcbfbkxcwsA%2Ffd5440ef-6b0f-473f-ab1a-d6f90873c9c9.png?alt=media&amp;token=28ddb979-16a9-4257-8b88-3f37d665f009" alt=""><figcaption><p><strong>Figure 6</strong>: PVGS Acquisition</p></figcaption></figure>

<figure><img src="https://4054096626-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FYbyVjpgEQX9nfCkpYoFP%2Fuploads%2FRcsJLbmY3exOItziO77r%2Fd11cc708-4b8d-4b0f-bc2a-6f1c4eb9f57d.png?alt=media&amp;token=bbbee94a-064b-47bf-b294-708121f2a4b1" alt=""><figcaption><p><strong>Figure 7:</strong> WTGS Acquisition</p></figcaption></figure>

## Profiles Panel <a href="#profiles-panel" id="profiles-panel"></a>

When the panel referred to as Profiles is selected, figure 8 appears.\
The student can activate/deactivate the 24-hours profiles of the load, wind speed and solar irradiance via the push button.\
Once activated, the scopes display the following waveforms: solar irradiance, wind speed, load profile, PV output power, wind turbine power production, and the battery active power.

<figure><img src="https://4054096626-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FYbyVjpgEQX9nfCkpYoFP%2Fuploads%2F9Vxqs9v6XaMNDP4y8mkw%2Feb1e3062-be30-4113-a7e3-99e51e845e52.png?alt=media&amp;token=f5b28de6-99f7-4565-b301-b923c9d426bf" alt=""><figcaption><p><strong>Figure 8</strong>: Profiles Panel of the Microgrid Laboratory</p></figcaption></figure>


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://www.opal-rt.com/docs/courseware/electric-courseware/renewable-energy/microgrid-system/panels-overview.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.