> For the complete documentation index, see [llms.txt](https://www.opal-rt.com/docs/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://www.opal-rt.com/docs/hypersim/examples/benchmarks/hvac-230kv-24bus-ieee.md).

# HVAC 230kV 24Bus IEEE

## Description

The **IEEE 24‑Bus Reliability Test System** example, located in **File > Open an Example File > Benchmarks**, simulates the IEEE 24‑Bus network used for bulk power system reliability evaluation studies.

The main objective is to demonstrate system response to disturbances, support reliability analysis, and provide a baseline to compare methods for power system reliability assessment.

This model reproduces the data and parameters from reference \[1]. It includes 24 load/generation buses interconnected by 38 lines or autotransformers operating at 138 kV and 230 kV. The transmission network comprises cables, lines on a common right‑of‑way, and lines on a common tower. The generation system uses internal exciters, governors (speed regulators), and stabilizers. Two predefined three‑phase faults are provided at Buses 104 and 119. By default, the Bus 104 fault is enabled and set to activate at 0.1 s and clear 0.05 s later. The Bus 119 fault is disabled by default and has the same default timing. Users can modify the fault times or add additional faults as needed.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-9b23bb3d0ace0b563d94b0b7375702db75e88b72%2Fimage%20(1287).png?alt=media" alt=""><figcaption></figcaption></figure>

## Requirements

This example model does not require any additional hardware or licenses.

## Detailed explanation

**System configuration**

* Network: 24 buses with 38 transmission elements (lines and autotransformers) at 138 kV and 230 kV, including cables and lines sharing a right‑of‑way or tower.
* Generation controls: All synchronous machines are controlled by internal exciters, governors (speed regulators), and stabilizers. To change these settings, double‑click the machine subsystem and edit the parameters in the block mask.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-b966598a31544a4355c2f8034185cec75ab829cf%2Fimage%20(1288).png?alt=media" alt=""><figcaption></figcaption></figure>

**Fault configuration**

* Two three‑phase faults are included: one at Bus 104 (enabled by default) and one at Bus 119 (disabled by default).
* Timing parameters within each fault subsystem:
  * T1: fault activation time.
  * T2: fault clear time.
* Default timing: activate at 0.1 s and clear 0.05 s later.
* To run only the Bus 119 scenario, enable the fault subsystem named “Fault2” and disable the subsystem named “Fault1.”

## Simulation and results

### Scenario 1: Three‑phase fault on Bus 104

A three‑phase fault is applied at Bus 104 at 0.1 s and cleared 0.05 s later. ScopeView waveforms include:

* Voltages at Buses 103, 111, and 117.
* Bus voltage and fault current at the faulted location.
* Machine terminal voltages.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-7913937d9f769de9646352a5d11e7f288c8ef547%2Fimage%20(1362)%20(1).png?alt=media" alt=""><figcaption><p>Fault configuration settings</p></figcaption></figure>

These results illustrate the voltage depression during the fault and the post‑fault recovery once the fault is cleared.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-9de7e4a35e209fff684f9e4d6e99bc8cc19e23fa%2Fimage%20(1289).png?alt=media" alt=""><figcaption><p>Voltage of Buses 103, 111, and 117 with a three-phase to-ground fault at Bus 104.</p></figcaption></figure>

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-93d63745e62bc95c291459f9e3914eaa9eac65ee%2Fimage%20(1290).png?alt=media" alt=""><figcaption><p>Bus Voltage and Fault current with a three-phase to ground fault at Bus 104.</p></figcaption></figure>

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-fa785ec6afe16c31e5738ddbb9fec1e8948a90c4%2Fimage%20(1291).png?alt=media" alt=""><figcaption><p>Machine terminal voltages with a three-phase to ground fault at Bus 104.</p></figcaption></figure>

### Scenario 2: Three‑phase fault on Bus 119

A three‑phase fault is available at Bus 119 with the same default timing (activate at 0.1 s, clear after 0.05 s). By default, this fault is disabled. When enabled (and the Bus 104 fault is disabled), ScopeView waveforms include:

* Voltages at Buses 103, 111, and 117.
* Bus voltage and fault current at the faulted location.
* Machine terminal voltages.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-2f67370ddad579a443d7edabd0c3039fca21b854%2Fimage%20(1292).png?alt=media" alt=""><figcaption><p>Voltage of Buses 103, 111, and 117 with a three-phase to-ground fault at Bus 119.</p></figcaption></figure>

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-e66ca9b78ef3a964393ffdca187f17cd859d13df%2Fimage%20(1293).png?alt=media" alt=""><figcaption><p>Bus Voltage and Fault current with a three-phase to ground fault at Bus 119.</p></figcaption></figure>

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-7f6a99615986064ba3d4d60da40cedc63f659a6a%2Fimage%20(1294).png?alt=media" alt=""><figcaption><p>Machine Terminal voltages with a three-phase to-ground fault at Bus 119</p></figcaption></figure>

These results similarly show the system’s transient response to the fault and recovery after clearing.

## References

\[1] The IEEE Reliability Test System – 1996, IEEE Transaction on Power Systems, Vol. 14, No. 3, August 1999.


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://www.opal-rt.com/docs/hypersim/examples/benchmarks/hvac-230kv-24bus-ieee.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.