# HVAC 500kV 6Bus

## Description

The **HVAC 500 kV 6‑Bus** example, located in **File > Open an Example File > Transmission**, models a high‑voltage AC transmission network with six buses, two transformers, and two generators (voltage sources). It operates at 60 Hz with voltage levels of 13.8 kV, 66 kV, and 500 kV.

The main objective is to illustrate traveling‑wave propagation on a 300 km line, single‑phase fault initiation, breaker operation at current zero, and system recovery to steady state.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-97a30fcb7be196a16407ac8f46a6be8c9a4d76d8%2Fimage%20(1005).png?alt=media" alt=""><figcaption></figcaption></figure>

## Requirements

The simulation time step is 50 µs.

## Detailed explanation

A 3‑phase Constant Parameter Line represents a 300 km transmission line and introduces a measurable propagation delay between buses WES7 and EST7.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-3d36f51ae73ca59e64f5e269b603bef366b68510%2Fimage%20(1011).png?alt=media" alt="" width="563"><figcaption><p>CP line configuration</p></figcaption></figure>

Event sequence and timing:

* A single‑phase fault occurs on phase A at bus WES7 at t = 0.028 s.
* Two breakers receive an open command at t = 0.1 s and open when the phase current is close to zero to isolate the fault.
* The fault clears at t = 0.15 s.
* Both breakers reclose at t = 0.2 s.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-2913b6664ea722a09dc43d31d05c8e42badab3aa%2Fimage%20(1012).png?alt=media" alt="" width="563"><figcaption></figcaption></figure>

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-836a9f7ce6b440ad71a32d7133503b34a5fc1011%2Fimage%20(1013).png?alt=media" alt="" width="563"><figcaption><p>Configuration of both breakers</p></figcaption></figure>

## Simulation and results

Use the ScopeView template *HVAC\_500kV\_6Bus.svt* to review recorded signals, including bus voltages at WES7 and EST7, breaker currents (Di1 and Di2), and fault currents.

* The system starts in steady state.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-fd2857fbfbd4a89c8a09ea990a850c99c4e1fe86%2Fimage%20(1006).png?alt=media" alt=""><figcaption></figcaption></figure>

* At t = 0.028 s, the phase A voltage at WES7 collapses to zero due to the fault. The traveling wave reaches EST7 after approximately 1 ms via the 300 km line.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-570cfc39c511ff98faa271ea021f6c4b075f3ced%2Fimage%20(1007).png?alt=media" alt=""><figcaption></figcaption></figure>

* Around t = 0.1 s, the breakers open at current zero, isolating the fault; bus voltages begin to recover and fault currents decrease significantly.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-df7c43bb2191e6865eca9be0d4d3b14737ec1e64%2Fimage%20(1008).png?alt=media" alt=""><figcaption></figcaption></figure>

* At t = 0.15 s, the fault clears and the fault current falls to zero.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-2f289dc674a48e5ce50612cadeb8f0f0fea7150c%2Fimage%20(1009).png?alt=media" alt=""><figcaption></figcaption></figure>

* At t = 0.2 s, both breakers reclose; the system returns to steady state at approximately t = 0.7 s.

<figure><img src="https://3623212549-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLxgTpoh7kyPmQ5vuyqD7%2Fuploads%2Fgit-blob-5147cae33a02d323c409476e29e0cb76d54ddbd0%2Fimage%20(1010).png?alt=media" alt=""><figcaption></figcaption></figure>


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://www.opal-rt.com/docs/hypersim/examples/transmission/hvac-500kv-6bus.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.