De-Risking Grid Code Compliance for a 50 MW Grid-Forming BESS

Friedrich-Alexander-Universität Erlangen-Nürnberg (FAU)

Academia, Energy

10 / 28 / 2026

De-Risking Grid Code Compliance for a 50 MW Grid-Forming BESS

The Customer

Friedrich-Alexander-Universität Erlangen-Nürnberg (FAU) bridges academic research and industrial practice through its Institute for Electrical Energy Systems. For the Neilston Greener Grid Park project, FAU worked closely with Fluence Energy GmbH, a global leader in energy storage technology and the project’s BESS supplier and power plant controller developer, to validate the complete 50 MW grid-forming BESS against grid code requirements before commissioning.

The Challenges

  • Limited flexibility when requirements or controller parameters evolve during development.
  • High costs associated with repeated site testing campaigns.
  • Long feedback cycles between development, integration, and validation teams.
  • Difficulty reproducing severe grid disturbances in a controlled and repeatable manner.
  • Increased project risk due to the late discovery of control and integration issues.

The OPAL-RT Solution

  • CHIL Testing with HYPERSIM: A comprehensive CHIL platform based on HYPERSIM reproduced demanding grid-code scenarios in a controlled and repeatable laboratory environment.
  • Real Hardware Integration: The platform integrated the actual PPC, physical measurement hardware, converter control implementations, and the simulated transmission network.
  • High-Fidelity Real-Time Modeling: A detailed switching converter model was developed in HYPERSIM and benchmarked against the real device to accurately capture converter dynamics.
  • Automated Testing Workflow: HYPERSIM’s Python API automated grid-code test sequences, scenario configuration, test campaigns, data collection, and compliance reporting.

The Results

  • Reduced Technical Risk: Potential control and integration issues were identified earlier, reducing the likelihood of costly late-stage corrections.
  • Increased Confidence: Validating the full control architecture under realistic conditions increased confidence in compliance readiness.
  • Greater Test Coverage: Scenarios difficult or impossible to reproduce in the field could be executed repeatedly and consistently in the laboratory.
  • Accelerated Validation Workflow: HYPERSIM real-time simulation and Python-based automation reduced manual effort and enabled efficient, large-scale test campaigns.
  • Enhanced Scalability: The reusable framework can support future grid-forming BESS developments and growing compliance-testing needs.

 

Read the full story

Explore more success stories

Dive deeper into our full collection of success stories in the resource center.

Discover more
Background image

Start building your own success story

Validate high-voltage systems with confidence. Discover how OPAL-RT’s real-time HIL simulation solutions can help you automate, accelerate, and future-proof your testing process for power electronics and grid applications.

Success stories

More success stories

New Breakthrough in Full Topology HIL Simulation Testing for On-Board Chargers

Automotive

06 / 04 / 2026

New Breakthrough in Full Topology HIL Simulation Testing for On-Board Chargers

SHINRY

SHINRY Technologies leverages OPAL-RT’s high-performance HIL simulation solution—integrating the OP4800-IO series expansion units and eHS—to overcome the complex challenges of full-topology modeling and high-frequency testing for On-Board Chargers (OBC). This solution achieves nanosecond-level real-time simulation and supports switching frequencies of several hundreds kHz, significantly accelerating control algorithm verification and identifying hardware-software integration risks early in the development cycle.

OPAL-RT HIL simulation for variable frequency drive R&D

Energy

01 / 21 / 2026

OPAL-RT HIL simulation for variable frequency drive R&D

Harvest

Harvest leverages OPAL-RT’s HIL simulation solution (integrating OP5707XG hardware, eHS and ARTEMiS software) to address complex MV VFD modeling and testing challenges. This solution accelerates control algorithm validation, enables safe and flexible multi-motor testing, and speeds up product development, empowering Harvest to deliver reliable, high-performance MV VFDs for global industrial applications.

State-of-the-art prototype testing of PAC devices for the power industry

Energy

03 / 17 / 2025

State-of-the-art prototype testing of PAC devices for the power industry

Protecta Electronics

Protecta Electronics leverages OPAL-RT’s real-time simulation technology to test and validate protection, automation, and control (PAC) devices for the power industry. By automating complex test scenarios, Protecta has streamlined R&D, ensured compliance with global standards, and improved coordination between protection relays—advancing grid safety and reliability.