Data Center Power Simulation
AI data centers are now some of the largest loads on the grid. Validate UPS, BESS, protection and energy management controls with real-time hardware-in-the-loop testing, so problems surface in the lab instead of at commissioning.
They trust us
AI data centers behave nothing like the loads utilities planned around.
Their converters, UPS and backup systems interact with the grid in ways offline studies miss, and many problems only show up once equipment is energized:
- Loads that shift in microseconds: GPU workloads ramp faster than most protection and control schemes were designed for.
- Converters on weaker grids: UPS, rectifiers and backup systems interact with the grid in ways a static study cannot show.
- Problems found at commissioning: When a failure surfaces on site, every fix is expensive and every hour of downtime counts.
Purpose-built for data center power validation
Real-time HIL testing runs your real controllers against a simulated data center and grid, so your team can:
Data Center Solutions Guide
Three places HIL testing pays off in the gray space.
Our Data Center Solutions Guide walks through each application with customer cases, from PHIL validation of crypto-miner loads for ERCOT requirements to HVAC drive testing with Trane.
- Grid side: protection and grid compliance testing, genset controller validation and AI load profiles replayed from your own data
- Energy management: EMS, EPMS and DCIM testing over Modbus, DNP3 and IEC 61850, through to cooling and HVAC drive validation
- Power conversion: UPS controllers across online, battery and bypass modes, through to solid-state transformers


