Data Center Power Simulation

Data Center Power Simulation

AI data centers are now some of the largest loads on the grid. Validate UPS, BESS, protection and energy management controls with real-time hardware-in-the-loop testing, so problems surface in the lab instead of at commissioning.

Talk to an engineer Get the guide

They trust us

AI data centers behave nothing like the loads utilities planned around.

Their converters, UPS and backup systems interact with the grid in ways offline studies miss, and many problems only show up once equipment is energized:

  • Loads that shift in microseconds: GPU workloads ramp faster than most protection and control schemes were designed for.
  • Converters on weaker grids: UPS, rectifiers and backup systems interact with the grid in ways a static study cannot show.
  • Problems found at commissioning: When a failure surfaces on site, every fix is expensive and every hour of downtime counts.

Success story

Powering next-generation data center reliability with advanced UPS testing

Discover how Schneider Electric accelerated the development of its modular Galaxy PX UPS engineered for small and medium data centers using our solution to achieve faster validation, enhanced reliability, and significantly improved testing efficiency.

Read success story

With OPAL-RT, we introduced a new HIL-based simulation platform that automates 80% of UPS testing and executes 700+ cases across 10–15 rounds. Compared to the previous 50% coverage and 600+ cases in 3–4 rounds, this boosts automation by ~30% and weekly test volume by over 40%.The platform lets us recreate complex real-world events and extreme fault conditions with accuracy, all without putting our hardware at risk. Remote, continuous testing allows the system to run for a full week without supervision, which has dramatically accelerated our R&D.

Ricky Zhang

Chief Firmware Test Specialist, Secure Power Division, Energy Management Business at Schneider Electric

Quote image

Data Center Solutions Guide

Three places HIL testing pays off in the gray space.

Our Data Center Solutions Guide walks through each application with customer cases, from PHIL validation of crypto-miner loads for ERCOT requirements to HVAC drive testing with Trane.

  • Grid side: protection and grid compliance testing, genset controller validation and AI load profiles replayed from your own data
  • Energy management: EMS, EPMS and DCIM testing over Modbus, DNP3 and IEC 61850, through to cooling and HVAC drive validation
  • Power conversion: UPS controllers across online, battery and bypass modes, through to solid-state transformers

Get the guide

Image du module Texte et Image

See what HIL can validate in your data center

Share your project and a data center engineer will walk through which UPS, BESS, protection and energy management tests apply to it.

Talk to an engineer

Why OPAL-RT

Why data center teams test with OPAL-RT.

  • 25+ years of real-time simulation across power systems and power electronics
  • Data center features built in, from large load profiles and UPS modes to EMS and dynamic scenarios
  • 40 ns resolution with a consistent timestep, and up to 64 modular VSCs within a single FPGA
  • One provider for the whole gray space, from genset testing and grid compliance to UPS, SST and DCIM validation

Talk to an engineer

Image du module Texte et Image

FAQ

Find the answers to your questions

Still have questions about your project?

Talk to an engineer

How does hardware-in-the-loop testing reduce risk before commissioning a data center?

What aspects of data center systems can be simulated with OPAL-RT platforms?

Why are traditional planning and offline simulation methods often insufficient for data centers?

How can data center developers and EPCs evaluate grid interconnection and stability impacts?

Can OPAL-RT platforms support testing for grid code compliance and utility requirements?

How can real-time simulation help data center owners plan for AI-driven load growth?

Talk to an engineer

Walk through your data center topology with our engineers.

Tell us what you are working on. A data center engineer will follow up to review your topology and test plan.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.